mm
 


How to remove PE

Issue 01 - How To Remove PE

03/04/06

The majority of pipelines supplied by F&T are coated in 3 layer PE for 100% corrosion protection. The advantage of this is that it gives the pipeline no minimum longevity of life, since it does not allow corrosion to start in the first place.

Theoretically the pipeline could last for 100’s of years. However, there is a trick in removing the PE coating. (This is necessary when a pipe is cut to make a new spigot end). Do not heat the outside of the pipe, but the inside.

 

 

Using a propane torch with a large head keep the flame moving all the time around the inside of the pipe. When the external PE coating is hand hot, cut around the circumference of the pipe, and just peel the PE off.

 

 

  
Any information regarding Environmental Aspects or Health & Safety risks should be directed through the Frazer and Tabberer IMS Systems.  dfrazer@frazerandtabberer.co.uk

© 2005 Frazer and Tabberer limited
  
Tayberry House, 6 Riland Industrial Estate, Sutton Coldfield, Birmingham, B75 7BB

tel: +44 (0) 121 311 2606  fax: +44 (0) 121 311 1218 e-mail: enquiries@frazerandtabberer.co.uk

 

home | steel pipe | locking lids | canusa heat wrap | pipe-finder | faq's